Page 48 - Urban Renewal Authority 2023-24 Annual Report
P. 48
OPERATING REVIEW
Progress of Various Building Rehabilitation Subsidy Schemes (up to 30 June 2024)
IBRAS Building blocks rehabilitated Units rehabilitated
70
3,300
Integrated Building in 2023/24 in 2023/24
Rehabilitation 2,160 102,000
Assistance Scheme since 2004 since 2004
IBRAS cases in progress: 7,840 (8,260 building blocks)
Managing Government-funded Subsidies
OBB 2.0 FSWS
Operation Building Bright (OBB) 2.0 Fire Safety Improvement Works Subsidy Scheme
67%
43% 3,100 (3,000 AIPs issued)
(1,327 AIPs issued ) 4,500
Applications Applications
received received 119
Buildings with
improvement works
Buildings with repair / completed
improvement works
completed
Cat.1 Cat.2
146 537
LIMSS
DRS
LIMSS DRS
Lift Modernisation Subsidy Scheme Building Drainage System Repair Subsidy Scheme
78% 56%
(1,575 AIPs issued (1,410 AIPs issued)
involving 5,055 lifts) 1,180
2,000
368 Applications 2,520 Applications with
Applications with received Category 1 investigation works
work completed (involving applications commenced
received
(involving 835 lifts) 8,200 lifts)
1,470
Category 2 buildings
with investigation or
repair works
BMGSNO commenced
Building Maintenance Grant Scheme for Needy
Owners
57% 25,300
(14,300 AIPs granted) Applications
received
Funding and Managing URA’s Own Subsidy Schemes
CAS MBISS
Common Area Repair Works Subsidy Scheme Mandatory Building Inspection Subsidy Scheme
Building blocks rehabilitated Units rehabilitated Completed inspections since 2012
60 2,800 470 building blocks 19,000 units)(
in 2023/24 in 2023/24
1,850 86,000
since 2011 since 2011
2,900 building blocks
Common area repair works in progress
46