Page 21 - Urban Renewal Authority 2023-24 Annual Report
P. 21

2023






                       AUG

                     In collaboration with the Hong Kong
                  Federation  of  Youth  Groups  (HKFYG)
                  Leadership Institute, URA organised the
                  youth training programme URA Youth Speak
                  to engage the younger generation. About
                  30 secondary school students participated
                  in training on building rehabilitation and
                  exchanged their ideas on urban renewal
                  with URA senior management.

                                                                                          SEP

                                                            eResidence Tower 3, the URA’s Starter Homes
                                                         (SH) Project for Hong Kong Residents, received 3,670
                                                         valid applications for the sales of 260 units. About 67
                                                         percent of the SH units were sold to eligible first-
                                                         time home buyers in March 2024.





                       OCT


                     The URA handed over a 5-storey commercial space in Tung Chau Street/Kweilin
                  Street Project (DL-5:SSP) to the Hong Kong Design Centre for the establishment and
                  operation of the Design and Fashion Base. With an area of approximately 3,600
                  square metres, the Base serves as a hub for nurturing young designers, fashion
                  designers and startups, while fostering tourism development in the Sham Shui Po
                  district and bringing new vitality to the local economy.

                                                                                         NOV


                                            The third-round application of the Operation Building Bright 2.0 (OBB 2.0)
                                         & Fire Safety Improvement Works Subsidy Scheme concluded with very good
                                         responses from property owners. The application number increased by 75
                                         percent compared with that of the second round, reflecting the effectiveness
                                         of the URA’s stepped-up effort in promoting building rehabilitation.
                       DEC


                     Over 1.3 million visitors and participants
                  soaked up the fun at a variety of events
                  such as the Christmas Carnival at the “Free
                  Space” in Kwun Tong, as the URA
                  collaborated   with   Government
                  departments to transform the site of
                  Development Areas 4 and 5 at Kwun Tong
                  Town Centre Project (K7) into a temporary
                  activity space for public enjoyment during
                  the preparation of project re-tendering.
                  The URA has also built a temporary
                  children’s playground and ballcourts in
                  addition to opening up a public
                  passageway which connects Yue Man
                  Square and Kwun Tong Road to enhance
                  walkability.
                                                                             URA ANNUAL REPORT 2023-24     19
   16   17   18   19   20   21   22   23   24   25   26