Page 143 - URA Annual Report 2021-22
P. 143

 (expressed in Hong Kong Dollars)
2. Significant accounting policies (Continued)
(l) Properties held for sale and properties under development for sale
Properties held for sale and properties under development for sale at the end of the reporting period are stated at the lower of cost and net realisable value.
(m) Costs of rehousing units provided by the Hong Kong Housing Authority and the Hong Kong Housing Society
The Hong Kong Housing Authority and the Hong Kong Housing Society have agreed to provide certain rehousing units to the Group. In return, the Group will pay for the reservation fees until a tenant is moved into the unit and the allocation costs of the rehousing unit. These costs are recognised as part of the cost of properties under development referred to in Note 2(k).
(n) Provisions and contingencies
Provisions are recognised when the Group has a present legal or constructive obligation as a result of past events; it is more likely than not that an outflow of economic benefits will be required to settle the obligation; and the amount can be reliably estimated. Provisions are not recognised for future operating losses, except for those cases where the Group has a present obligation as a result of committed events.
Where there are a number of similar obligations, the likelihood that an outflow will be required in settlement is determined by considering the class of obligations as a whole. A provision is recognised even if the likelihood of an outflow of economic benefits with respect to any one item included in the same class of obligations may be small.
A contingent asset is a possible asset that arises from past events and whose existence will be confirmed only by the occurrence or non-occurrence of one or more uncertain events not wholly within the control of the Group.
A contingent asset is not recognised but is disclosed in the notes to the consolidated financial statements when an inflow of economic benefits is probable. When inflow is virtually certain, an asset is recognised.
A contingent liability is a possible obligation that arises from past events and whose existence will only be confirmed by the occurrence or non-occurrence of one or more uncertain future events not wholly within the control of the Group. It can also be a present obligation arising from past events that is not recognised because it is not probable that an outflow of economic benefits will be required or the amount of obligation cannot be measured reliably.
A contingent liability is not recognised but is disclosed in the notes to the consolidated financial statements. When a change in the probability of an outflow of economic benefits occurs so that the outflow is probable, it will then be recognised as a provision.
URA ANNUAL REPORT 2021-22 137





















































































   141   142   143   144   145